Project Description

St. Augustine, FL

The engineers at WET Engineering have been providing continuing engineering services to North Beach Utilities (NBU) for over ten years. Our contract includes providing plan review services, water and wastewater treatment facility design and permitting, consumptive use permitting and compliance reporting, and infrastructure design. North Beach Utilities (NBU) is a small, private utility that serves the Vilano Beach area.

As part of the continuing contract, WET Engineering recently provided permit renewal services for the wastewater plant. The plant had a limited permit capacity due to the contribution of concentrate flow from the water plant. At the time of the renewal, the wastewater plant was approaching 80% or the permitted capacity. Because the plant is challenged by minimal land availability and its close proximity to the ocean, it was imperative that the permitted capacity be increased to match the design capacity of the plant. During the renewal process, WET Engineering evaluated both the water and wastewater plants, and worked with FDEP and NBU to establish a more realistic concentrate flow limitation.

In addition, WET Engineering developed methodology for monitoring the concentrate / effluent blend and revised the flow monitoring to allow NBU greater flexibility in their plant operations. By increasing the permitted capacity, an unnecessary and expensive wastewater plant expansion was avoided. In addition to the recent permitting services, WET Engineering has provided engineering services to support NBU’s annual update and renewal application to the St. Johns River Water Management District for their current Consumptive Use Permit. The consulting services included the compilation of water consumption data, providing water use projections, reviewing water quality data, and evaluating conservation efforts. The project was challenging due to significant discrepancies between the metered flows exiting the water plant and the individual meter readings from customer accounts. Instead of the expected losses in the distribution system, NBU’s customer accounts revealed more water was being sold than produced. WET Engineering worked with NBU to replace flow meters and to evaluate the system to determine where the discrepancies occurred.

In addition, WET Engineering has also provided plan review and engineering support services to NBU. Recently, WET Engineering provided recommendations to NBU regarding excessive infiltration in the newly installed sewer system at Vilano Town Center. NBU used these recommendations to insure the system was repaired prior to taking ownership of the system.

>

Praise

Testimonials

What Our Clients Are Saying...

Max Usina

General Manager, North Beach Utilities

We have been working with WET Engineering/North Beach Engineering since early 2000. In every instance they were knowledgeable and finished work in a timely manner.

Matt Boyd

Director of Operations, Whale’s Tale Waterpark

We were looking to install ProSlide's very first RideHouse and needed an engineer who could design a drainage and supply water plan as well as a mechanical room. We heard about the problems other parks had with similar structures, and couldn't be happier about our choice to go with WET Engineering. They were there for support during the build process and the system works without a flaw.

Gary Pinner

City Manager, Town of Cross City

WET Engineering is not only efficient & effective in their professional role, but they take the time to engage with clients with a genuine interest in how a project impacts the entire area and community. Their knowledge & attention to detail have aided the Cross City in securing funding and completing time sensitive projects.

David J. Bolam

Chief Engineer, Clay County Utility Authority

WET Engineering has a 5-year continuing contract with the Clay County Utility Authority and has successfully completed a number of utility plant design projects. We are very satisfied with their work and the professionalism of the staff. The projects were completed on schedule and we have had minimal change orders.

  Start Project

Start a Project

  • This field is for validation purposes and should be left unchanged.

We look forward to hearing from you. Need immediate assistance? Call us at:
904-223-9773