Photo Gallery

Project Description

Middleburg, FL – View Their Website

This project consisted of a 5,000 sf multipurpose swimming pool comprised of a Jr. Olympic-sized competition pool with six lap lanes; 1,000 sf plunge pool area for a future poolside slide; and a 720 sf zero entry area with handicapped ramp into the pool. The pool utilized a stainless steel perimeter overflow gutter design to promote less wave action and a “faster” pool for competitions. The treatment system was designed to be environmentally friendly and as a teaching tool for the Scouts and included an electrolytic generation system (“salt system”), variable frequency drives on the recirculation pump motor, and a vacuum sand filter housed in a stainless steel collector tank that uses less backwash water than conventional filtration systems. The pool opened in spring 2010.

>

Praise

Testimonials

What Our Clients Are Saying...

Max Usina

General Manager, North Beach Utilities

We have been working with WET Engineering/North Beach Engineering since early 2000. In every instance they were knowledgeable and finished work in a timely manner.

Gary Pinner

City Manager, Town of Cross City

WET Engineering is not only efficient & effective in their professional role, but they take the time to engage with clients with a genuine interest in how a project impacts the entire area and community. Their knowledge & attention to detail have aided the Cross City in securing funding and completing time sensitive projects.

David J. Bolam

Chief Engineer, Clay County Utility Authority

WET Engineering has a 5-year continuing contract with the Clay County Utility Authority and has successfully completed a number of utility plant design projects. We are very satisfied with their work and the professionalism of the staff. The projects were completed on schedule and we have had minimal change orders.

Matt Boyd

Director of Operations, Whale’s Tale Waterpark

We were looking to install ProSlide's very first RideHouse and needed an engineer who could design a drainage and supply water plan as well as a mechanical room. We heard about the problems other parks had with similar structures, and couldn't be happier about our choice to go with WET Engineering. They were there for support during the build process and the system works without a flaw.